Concrete scanning · Lévis
Concrete scanning and GPR in Lévis
In Lévis, concrete scanning with ground-penetrating radar (GPR) locates rebar, conduits and other embedded items before you core, drill or cut a slab, wall or column. Before setting a coring date, check that the area is not covered by an interim control by-law.
Lévis
Working in Lévis
In Lévis, two interim control by-laws restrict new permits in the areas served by the Saint-Nicolas and Desjardins plants, and a permit is required at all times in a constraint zone or a heritage area. An opening tied to a construction project or a change of use is therefore planned after that check. The survey itself is prepared with the position of the openings, the known slab thickness and the accessible face.
In Lévis, a permit is required at all times for a property in a heritage area, subject to a PIIA or in a constraint zone, such as soil with low bearing capacity. Two interim control by-laws, adopted in the spring of 2025, also restrict new permits in the areas served by the Saint-Nicolas and Desjardins wastewater treatment plants.
Preparing your project in Lévis
- Check on the City’s interactive map whether the building is covered by an interim control by-law
- State whether the property is in a constraint zone or a heritage area
- Locate the planned openings and the face of the slab that will be accessible
From the Lauzon shoreline to the plateau, building stock that followed the river, then the road
The Lauzon seigneury was created in 1636, but the land along the river was poorly suited to farming: eel fishing came first, while Saint-Nicolas, Saint-Jean-Chrysostome and Pintendre grew through agriculture. In the early 19th century, every cove on the shoreline was used to store and process timber bound for England, and mills and shipyards settled on the banks still available. Captain Allison Davie’s ship repair yard, founded in 1829, is presented by the City as the oldest shipbuilding industry in the country.
The town of Lévis was born from a charter assented to on May 18, 1861, and well-to-do families built their homes on the heights, away from the working shoreline. The Quebec Bridge, inaugurated in 1919 after two collapses during construction, then the Pierre-Laporte Bridge, opened in 1972, came with the post-war population boom: economic and commercial activity moved from the riverfront to the plateau, along the main highways.
That growth has a downside. The City states that the Desjardins and Saint-Nicolas wastewater treatment plants have reached capacity, and two interim control by-laws adopted on March 24, 2025 restrict new construction or renovation permits in the areas they serve. Elsewhere, a permit is required at all times in a heritage area, under a PIIA or in a constraint zone, for example on soil with low bearing capacity.
When a building on the shoreline or in a former industrial area has changed use, its floor may have been repaired or strengthened along the way. Before drilling or coring, say whether the target slab has already been repaired and whether earlier work left drawings: a survey that separates the original slab from later repairs is much easier to read. If the building is in an area covered by an interim control by-law, first confirm with the City that the project can proceed.
How ground-penetrating radar works
Ground-penetrating radar (GPR) emits high-frequency electromagnetic waves and records their reflections at boundaries between materials with different properties, such as concrete and steel. The ASTM D6432 guide describes this investigation method.
GPR is also one of the non-destructive test methods for in-place concrete reviewed by the American Concrete Institute (report ACI 228.2R-13).
Method, preparation and GPR limitations
When to request a scan, how to prepare the survey, how to use the findings and what ground-penetrating radar cannot see are all covered on our concrete scanning in Quebec page. Before core drilling, see why it matters to scan the concrete before coring. This page only covers what is specific to Lévis.
Frequently asked questions
Does concrete scanning damage the structure?
No. GPR is a non-destructive test method: the device moves over the concrete surface without drilling or coring it.
What can ground-penetrating radar detect?
Usually rebar, conduits and other embedded items whose electromagnetic properties differ from those of concrete. Readability depends in particular on depth and on the condition of the concrete.
Does an interim control by-law prevent the survey?
No. The survey is a non-destructive investigation. It is the project behind it, construction or a change of use, that these by-laws may affect: better to confirm it before committing the rest of the schedule.
Why mention a constraint zone for a simple opening?
Because the City requires a permit there at all times, even for work that would be exempt elsewhere. Knowing it from the request avoids scheduling an opening before the municipal process is settled.
Sources
- ASTM D6432-19, Standard Guide for Using the Surface Ground Penetrating Radar Method for Subsurface Investigation
- American Concrete Institute, ACI 228.2R-13, Report on Nondestructive Test Methods for Evaluation of Concrete in Structures
- Ville de Lévis: Permis de construction et rénovation (in French)
- Ville de Lévis: Règlements à caractère provisoire sur les projets de construction (in French)
- Ville de Lévis: Histoire de Lévis (in French)
- Ville de Lévis: Permis de construction et rénovation (in French)
- Ville de Lévis: Règlements à caractère provisoire sur les projets de construction (in French)