Skip to main content
438-815-6942info@scanaxis.ca
ScanAxis

Corrosion mapping · Saint-Jérôme

Corrosion mapping in Saint-Jérôme

Corrosion mapping locates the zones where reinforcing steel is likely corroding in a concrete slab or wall, so that repairs can be targeted in Saint-Jérôme. An operating loading dock or parking area is mapped around how the site is used.

Saint-Jérôme

Working in Saint-Jérôme

In Saint-Jérôme’s industrial and commercial areas, loading docks and parking areas often stay in use during the work. A corrosion map is therefore organized with the operator: traffic areas, time slots when a section can be closed, repairs already made. If a repair planned from the map affects a building subject to a PIIA, the City process is planned in the same schedule.

In Saint-Jérôme, applications for permits, certificates and PIIA approval are made online, with mandatory online payment. If the permit type needed is not on the list of online applications, the City asks you to book an appointment with one of its specialists, and PIIA approval can now come before the building permit.

Preparing your project in Saint-Jérôme

  1. Describe traffic areas and the possible closure time slots
  2. Mark earlier repairs on a drawing
  3. Check whether upcoming repairs fall under a PIIA

From the Rivière du Nord to a denser downtown, a regional capital in transformation

The parish of Saint-Jérôme de la rivière du Nord was canonically erected in 1834, around a small village on the riverbank. From 1868, Curé Labelle gave the town a leading role in settling the North and secured the Montreal to Saint-Jérôme railway in 1876. The P’tit Train du Nord linear park now starts downtown, at its kilometre zero.

Since 2002, Bellefeuille, Saint-Antoine, Lafontaine and Saint-Jérôme have formed a single municipality, the regional capital of the Laurentians. The City describes an accelerated urban transformation: its downtown densification plan calls for mixed-use projects with ground-floor retail built on surface parking lots, with underground parking, a TOD area around the intermodal station and the revitalization of landmark buildings, while the Health District grows around the regional health hub.

Applications for permits, certificates and PIIA approval are filed online, with mandatory online payment, but the list of eligible applications is mostly residential: a permit type that is not on it goes through an appointment with a City specialist. Since the new planning by-laws came into force, PIIA approval can also be requested separately from the building permit, and ahead of it.

The underground parking planned downtown and the loading docks in industrial areas are exposed to de-icing salts through long winters. A corrosion map is organized around how the site operates: state the traffic areas, the time slots when a section can be closed and the repairs already made, so the grid places them correctly.

Measuring corrosion activity

The ASTM C876 test method covers the estimation of the corrosion potential of uncoated reinforcing steel in concrete, for the purpose of determining its corrosion activity. Taken on a grid, these measurements produce a map of the surveyed surface.

Exposed slabs and parking garages

Parking garages are subject to specific obligations in Quebec: an annual visual verification and an in-depth verification report by an engineer every five years, according to the Régie du bâtiment du Québec. A corrosion map helps locate the zones to watch between these verifications.

  • On a cracked or spalled parking slab
  • Before planning concrete repairs
  • To monitor an area that has already been repaired

Mapping method, process and limitations

How potential measurements work, how the survey runs, how to read the maps and their limitations are covered on our corrosion mapping in Quebec page. To find where the rebar is before measuring, see our concrete scanning page. This page only covers what is specific to Saint-Jérôme.

Frequently asked questions

Does corrosion mapping indicate the strength of the structure?

Not directly. It provides information on the corrosion activity of the rebar; assessing structural capacity is an engineer’s responsibility.

Why combine it with a concrete scan?

Ground-penetrating radar locates the rebar and estimates its depth, which helps position corrosion measurements on the steel.

Do deliveries have to stop during the survey?

Not necessarily: the survey is done on portions cleared in turn. The phasing is agreed with the operator before the first pass.

Does the map show the rate of corrosion?

A single campaign shows where the probability of active corrosion is higher, not how it changes. Repeated passes on the same grid make it possible to follow its progress.

Downtown Montreal skyline and the Jacques Cartier Bridge at dusk

Contact

Your project starts here.

Tell us about your needs. Our team supports you with rigour and precision, wherever you are in Quebec.